Project Details
The City of Brampton has initiated a Schedule ‘B’ Class Environmental Assessment (Class EA) for improvements to the intersection of Heart Lake Road and Countryside Drive. The City identified the need for intersection improvements as part of an overall operational and safety improvement for the Heart Lake Road Corridor.
This Study will define the problem(s) with the intersection, identify and evaluate alternative solutions to the problem(s), evaluate alternative design concepts for the solution, and recommend a preferred design concept. Additionally, potential impacts to the social, cultural and natural environments will be assessed and mitigation measures will be determined.
Documents, reports, and updates
Study Commencement
Public Information Centre #1
Study Completion
Study Documents
Project Contacts
Ghaz Mohammad, M.Eng., P.Eng, PMP
Sr. Project Engineer, Infrastructure Planning
City of Brampton, Public Works & Engineering
1975 Williams Parkway
Brampton, ON L6S 6E5
T: 905 874 2949
F: 905-875-2505
E-mail: Ghazanfar.mohammad@brampton.ca
Dave Hallman, P. Eng
Consultant Project Manager
MTE Consultants Inc.
520 Bingemans Centre Drive
Kitchener, ON N2B 3X9
T: 905-639-2552 (ext. 1336)
F: 905-639-7727
E-mail: dhallman@mte85.com