​​​​​

Capital Design Procedures Manual

Consultants providing Capital Engineering drawings must comply with the City’s standards and requirements detailed here.
Learn More about Capital Design Procedures Manual

COR Program

Brampton has adopted the Certificate of Recognition (COR) program as part of its construction contract management and construction tendering process.
Learn More about COR Program

Digital Development Submissions

Development “As Constructed” drawing standards for Non-Capital Projects have been standardized across the Region of Peel.
Learn More about Digital Development Submissions

Electrical Forms

Checklists and forms for Traffic Signals and Street Lights can be found here.
Learn More about Electrical Forms

Park Planning and Development

Standards and policies for streetscape and park development projects.
Learn More about Park Planning and Development

Region of Peel Resources

Construction design guidance and standards for Regional projects.
Learn More about Region of Peel Resources

Road Permits

A Road Occupancy & Access Permit is required for any work done on City of Brampton streets or right-of-way.
Learn More about Road Permits

Site Plan Application Process

The Site Plan Review process examines design and technical aspects of a proposed development to ensure compliance.
Learn More about Site Plan Application Process

Surveys and Mapping

The City's Surveys and Mapping section maintains and administers the horizontal and vertical control networks throughout Brampton
Learn More about Surveys and Mapping

Contact Public Works and Engineering

Public Works and Engineering
Williams Parkway Operations Centre - 1975 Williams Parkway
Brampton, Ontario L6S 6E5
 Email Us

Need to report an issue?

 Create a 311 Service Request