All Development “As Constructed” submissions must adhere to the Development Digital Submissions Requirements Manual. This manual has been produced by the joint efforts of The Region of Peel, City of Brampton, Town of Caledon and City of Mississauga (referred to as The Peel Group). Working together, we have been able to assimilate and compile information to provide common digital requirements for all Development “As Constructed” submissions.
This manual has been tailored specifically to the digital aspects of the submissions. It is to be read in conjunction with all current and applicable manuals, dependant on which municipality/region the drawings are being submitted. Following these guidelines will provide a consistent digital drawing package which is recognizable to, and accepted by, all within The Peel Group.