Project Details

The City of Brampton has completed a Schedule 'C' Municipal Class Environmental Assessment (EA) to facilitate the continuation of the existing Mount Pleasant GO Station access road to lands west of Mississauga Road.​

The preliminary preferred design includes:​

  • Extension of Lagerfeld Drive to west of Mississauga Road with two lanes in each direction
  • Urban cross-section with curb and gutter and sidewalks on both sides
  • On Road separated cycle lane in each direction

Project Contact

Ghaz Mohammad​

Senior Project Engineer, Infrastructure Planning
Public Works & Engineering
City of Brampton
Tel: 311
Email: ghazanfar.mohammad@brampton.ca​