The Goreway Drive Grade separation over the CN tracks is a joint project between the City of Brampton, City of Mississauga and CN Rail. Goreway Drive is currently functioning as a four-lane urban arterial roadway within the City of Brampton, and as a major collector roadway within the City of Mississauga. The roadway provides north-south connectivity for commuter, commercial and emergency service vehicles between the two cities. In addition, Goreway Drive crosses CN’s existing Halton Subdivision approximately 300m north of Brandon Gate Drive. Presently, there are three tracks in service to facilitate the movement of freight trains into and out of CN’s Brampton Intermodal Terminal located to the north of the Project Area (also referred to as the Study Area Corridor). The Halton Subdivision currently accommodates about 50 freight trains per day to the service industry.

The City of Brampton and the City of Mississauga are responsible for monitoring population and employment growth to determine the anticipated impact on their respective transportation networks and implementing the required improvements in a timely manner. In keeping with this responsibility, the cities of Brampton and Mississauga, as co-proponents, propose to make requisite improvements to Goreway Drive within the Project Area. The proposed improvements will address the need for a grade separation at CN’s Halton Subdivision.

Design and approvals are being finalized, with the project anticipated to be tendered summer 2022, with a fall start to construction. Goreway Drive will be closed for 16 months for the construction to be completed.  The construction is expected to be completed summer 2024. Once the project has been tendered, signage and additional information will be provided.


View 1

View 1

View 2

View 2

View 3

View 3

View 4

View 4




Documents, reports, and updates

Environmental Assessment
Public Information Centre #1

Project Conta​cts

Mr. Shaid Mahmood, P.Eng.

Project Manager
100-300 Hagey Blvd.
Waterloo, ON N2L 0A4
519-585-7358
E-mail: Shahid.Mahmood@stantec.com

Mr. Solomon Choi, P.Eng. 

Senior Project Engineer
City of Brampton
Public Works & Engineering
1975 Williams Parkway
Brampton, ON L6S 6E5
905-874-2543
E-mail: Solomon.Choi@brampton.ca

Mr. Kenneth Truong, P. Eng. 

Capital Project Manager 
City of Mississauga 
Transportation and Works Department 
City Centre Drive, 8th Floor
Mississauga, ON L5T 2T4 
905-615-3200 ext. 583 
E-mail: Kenneth.Truong@mississauga.com

​​​​​​

​​​​​​​​​​​​​​​​​​​​​​​​​​

​​
​​​​​​​​​​