​​​​​​​​​​​​​​​Once you have picked up your permit, please review all documents for changes that may have been made to the submitted drawings. If any changes raise concern, review them with your plans examiner.​

Along with permit drawings you will receive the permit card and the important notice to permit holders card. These are discussed in detail below. On the same card you will find required reports, the mandatory inspections list and certificates to be provided during the construction process.

If a commitment form is filled out and signed, those professionals have committed to perform general reviews of the construction. Please review these req​uirements with your inspectors. Delays in submitting requir​ed documents can result in orders being issued and/or delaying of occupancy and/or closing the permit.

Please review the list of mandatory inspections for your type of permit (located on the back of your permit card) as some of these may not apply.​

Footing - At ready stage for pouring concrete, excavation complete, forms in place on undisturbed soil free of standing water, mud and loose earth

Backfill - Ready for backfilling of foundation, damp proofing applied, weeping tile covered with stone (min. 6 inches of cover)

Structural Framing - Prior to insulation but after rough ins are complete and passed (plumbing, hvac and electrical)

Occupancy - Notice of completion must be submitted (NofC form) prior to occupying the newly constructed space, once all applicable inspectors pass occupancy inspections an occupancy permit (sample) will be issued and mailed to owner within 5 business days

Final - All construction is complete, interior and exterior. Once passed by all applicable inspectors a letter of compliance will be sent within 10 business days

Septic System - Before backfilling

Underground Plumbing - Water service, sanitary and storm drains before covering

Above Ground Plumbing rough in - Plumbing System (drains, supply and venting) installed and pressure tested

Occupancy - Notice of completion must be submitted (NofC form) prior to occupying the newly constructed space, once all applicable inspectors pass occupancy inspections an occupancy permit (sample) will be issued and mailed to owner within 5 business days

Final - All construction is complete. Once passed by all applicable inspectors a letter of compliance will be sent within 10 business days

Heating and Ventilation Rough-in - HVAC ductwork complete

Insulation and Vapour Barrier - Prior to drywall but after the framing inspection is passed

Occupancy - Notice of completion must be submitted (NofC form) prior to occupying the newly constructed space, once all applicable inspectors pass occupancy inspections an occupancy permit (sample) will be issued and mailed to owner within 5 business days

Final - All construction is fully complete. Once passed by all applicable inspectors a letter of compliance will be sent within 10 business days